Battersea Power Station Phase 1

Courtesy of BPSDC visual impression of the development at Battersea 

The B1M capture the essence of construction documentary with the aim to educate, share and inspire and this video is no exception.  Special thanks to Battersea Power Station Development Company, Simpson Haugh and Partners, Carillion and the B1M for this short story. 
For more information, about the project and the B1M, please double-click on the url link below: http://www.theb1m.com/video/transforming-battersea-phase-one-circus-west-village
Three key areas of focus 
Step One
3D 
Battersea Power Station is and still is an iconic landmark in the capital of London.  The first of eight phases planned for the regeneration of Battersea Power Station was phase one 'circus west' that Carillion is delivery for BPSDC.  My involvement within the project was predominately to develop the 3D model for clash detection that designers would share their individual models for federation and enabled design coordination in a 3D environment.   This then enabled the project team to review through a series of planned design coordination workshops using Navisworks managed as the medium to review the federated model.   
Step Two 
4D
Supplementary, to this process above, we also explored visual work sequencing using the 3D model in conjunction with planning and synchro applications to assess construction work in specific areas that was considered complex construction.  The specific areas that were reviewed in detail was Block G energy centre, MEP installation within basement 1 and 2, apartment fit out and the hoist removal to enable the completion of external facade. 
The time sequence video produced was to enhance communications between project teams our specialist trade contractors, designers, the client and above all health and safety in a controlled environment.   With the overall objective to reduce and mitigate risk and enable synergies within the project teams.
Step Three
CIRCUS WEST RESIDENTS' CLUB 
Designed by David Linley set across three floors, offering spectacular views down the River Thames. 
More information to follow!
3D Model 
3D Modelling converting shared model files into a collaborative federated model for design collaborations and communicating complex construction details and interfaces

3D Modelling using Navisworks Manage 2014 - Design Coordination 
Analysing the 3D data in a federated model environment to reduce potential on-site delays and assigning actions to the design team to mitigate the risk. 
4D visual sequence for scenario testing for removal of the hoist and completion of the external facade
A 4D simulation of how an A-Typical apartment is constructed - focus is on sequence 
Battersea Power Station Phase 1
Published:

Battersea Power Station Phase 1

The first phase of the development, Circus West involves the construction of 866 apartments, townhouses, penthouses is split between two building Read More

Published: