Pavlo Baltaziuk's profile

Flooded 5th power unit of the Chornobyl

Flooded 5th power unit of the 
Chornobyl nuclear power plant.
Video fragment of virtual space, which was created on the basis of the flooded 5th power unit of the Chornobyl nuclear power plant. 3D model was made by me as part of the project in the context of the international project MADATAC, ARTEFACT: CHOrnobyl34, dedicated to the tragedy at the Chornobyl nuclear power plant on April 26, 1986.
The third stage of the Chornobyl nuclear power plant consists of the technological configurations of the 5th (the 5th unit of the Chornobyl NPP) and the 6th unit and new cooling systems in the form cooling towers. The construction of the 5th unit of the ChNPP was stopped at a very high degree of readiness of the facility itself. If not for the accident on April 26, 1986 at the 4th block of the Chornobyl nuclear power plant 5, the reactor would have been put into operation in November of the same year. At the end of May 1987, the final decision was made about the complete conservation and shutdown of the construction of the third stage of the Chornobyl nuclear power plant.

Music:
I Saw A Ghost Last Night by Leonell Cassio 
Flooded 5th power unit of the Chornobyl
Published:

Owner

Project Made For

Flooded 5th power unit of the Chornobyl

Video fragment of virtual space, which was created on the basis of the flooded 5th power unit of the Chornobyl nuclear power plant. 3D model was Read More